Construction for Carman Drive, McEwan Road, and Pilkington Road sidewalks is underway through summer/fall 2026.

Featured Pages

Carman Drive Sidewalk

Construction for the new sidewalk on a portion of Carman Drive is underway through summer 2026.

Carman Drive, between Waluga and Quarry, is now back open to two-way traffic! 

Read More

Construction for the new sidewalk on a portion of Carman Drive is underway through summer 2026.

Carman Drive, between Waluga and Quarry, is now back open to two-way traffic! 

McEwan Road Sidewalk

Construction is underway through summer 2026 for a new sidewalk on the north side of McEwan Road, between SW 65th Avenue and Kristi Way. 

Read More

Construction is underway through summer 2026 for a new sidewalk on the north side of McEwan Road, between SW 65th Avenue and Kristi Way. 

Pilkington Road Sidewalk

The City will be building a new sidewalk on Pilkington Road, from Boones Ferry Road to Rosewood Road, and from Willow Court to Lakeview Boulevard. Shaped by feedback from the community, available roadway space, and technical analysis, designs were completed in spring 2025. 

Construction is expected to start in early August and continue through early fall. 